342 kWpinstalled power
750panels, 455 Wp each
3 ×inverters, 100 kW each
Rooftop PV installation on an industrial hall
The PV BIOFARM NIEPRUSZEWO 1 installation at the PROWEST plant: solar energy for the plant’s own needs and for the national power system. From the building design, through permits, to installation and grid connection.
Parameters
- Installed power
- 342 kWp
- Panels
- 750 × 455 Wp
- Inverters
- 3 × 100 kW
- Installation type
- rooftop, production hall
Milestones
- Project completed
Scope of work
- Construction of the PV installation.
- Installation of PV panels on the production hall roof.
- Installation of DC/AC inverters, low-voltage cable lines and telecommunication systems.
- Earthworks for power infrastructure and monitoring.
The PV BIOFARM NIEPRUSZEWO 1 project has been completed and generates green energy for the PROWEST Sp. z o.o. plant.