300.3 kWPV installed power
Q1 2024date
Complete design documentation
Complete design documentation and cost estimates for a 300.3 kW PV installation with its technical infrastructure: from the preliminary design, through building permits, to technical support during construction.
Parameters
- Installed power
- 300.3 kW
- Scope
- design documentation and cost estimates
Milestones
- Documentation delivered, permits and approvals obtained
Scope of work
- Full technical documentation compliant with building law and the grid connection conditions.
- PV installation designs, including electrical design, electric shock protection and fire protection.
- Site analysis for solar exposure and mounting structures for the PV modules.
- Coordination of inverters, cabling and integration with the existing infrastructure.
- Approvals from grid operators and building supervision authorities.
The project was completed with building permits, grid operator approvals and technical acceptance.