7 MWpower
14 MWhcapacity
7 ×containers, 1 MW / 2 MWh each
15 kVMV cable lines
The largest commercial BESS in Poland
From concept, through the building design and building permits, to construction completed with technical acceptance approved by the DSO and the building supervision authority (PINB). The storage system is integrated with the PV installation and the plant’s power network.
Parameters
- Power
- 7 MW
- Capacity
- 14 MWh
- Containers
- 7 × 1 MW / 2 MWh
- Cable lines
- MV 15 kV
- Control
- EMS integrated with PV
Milestones
- Technical acceptance approved by the DSO and PINB
Scope of work
- Construction of the energy storage installation: 7 containerised storage units, each 1 MW / 2 MWh (7 MW / 14 MWh in total).
- Foundations for transformer stations and storage units, earthworks and ground stabilisation.
- 15 kV medium-voltage cable lines with optical fibre for data transmission.
- EMS energy management system integrated with the PV installation.
- Site fencing, internal roads and site grading.
Construction completed with technical acceptance approved by the DSO and PINB.