BESS energy storage project to RTB – Legnica
Complete design documentation for a stand-alone installation rated at 6.5 MW with a capacity of 30 MWh. The investment will store electricity and provide flexibility services to the national power system.
Parameters
- Power
- 6.5 MW
- Capacity
- 30 MWh
- Installation type
- stand-alone
- Grid operator
- PGE
Milestones
- Preparing for construction
Scope of work
- Building design of the BESS installation.
- All required planning opinions obtained before the building permit.
- Building permit obtained for the BESS installation.
- Detailed design of the BESS installation.
- Detailed design of the installation’s connection to the DSO grid.
- Update of equipment in the grid connection conditions issued by the DSO (PGE).
The project has been prepared for the construction phase.